Solar Electric Carport 5 Year Performance Review: Kovach Inc

May 25, 2010 marked the commissioning of Royal Solar’s first solar covered parking structure – the Kovach Inc. “Smart Carport” installation. Now that the solar carport system has been running for 5 years, let’s take a look at the solar system’s production. The Kovach Inc. Smart Carport consists of (90) Sharp 230 watt solar panels and (90) […]

Aspire Kids Sports Center in Chandler, AZ Goes Solar!

Royal Solar of Arizona is proud to announce that we have been able to help Aspire Kids Sports Center at 50 S Hearthstone Way in Chandler, AZ toward their renewable energy goals by installing a 100.215 kW solar electric system on the roof of their existing building.  This system is comprised of LG 255 watt […]

Aspire Kids Sports Center Solar Project Under Construction

Royal Solar of Arizona is proud to announce that we are near completion on a 100kW-DC rooftop solar project for Aspire Kids Sports Center in Chandler, Arizona.  This solar system will utilize the latest in solar technology, with 255 watt solar panels from LG and M215 micro inverters from Enphase Energy. The solar electricity will […]